Blue Sky Lifts Contact
Un ascenseur neuf dans un hall, portes ouvertes, lumiere chaude depuis la cabine inox. Rails de guidage acier fixes au beton d'une gaine d'ascenseur en cours d'installation. Hall d'immeuble en beton et verre, escalier et vitrage toute hauteur. Detail des portes palieres en inox brosse sous une lumiere rasante.
Blue Sky Lifts Contact

Blue Sky Lifts installs, replaces and modernises lifts across London — surveyed, fitted and handed over by the same small crew that quoted the job.

  • 4 weekstwo-floor rip-out
    and replacement
  • Since 2015London blocks,
    offices and homes
  • Witness testedhanded over passed,
    not snagged

Four kinds of job, all of them vertical.

Passenger lifts, goods lifts and platform lifts. If the package and the controller are already on order, we will fit those too — a good share of our work is exactly that.

A new lift shaft in a building under construction: bare concrete walls and timber guardrails at each landing opening.
A new shaft, before anything goes in

Eighteen weeks of paperwork before anyone picks up a tool.

That is the standard route for a residential block, start to finish, using the lift industry's own published guidance. Four and a half months — and the lift is still broken.

We are the other end of that process. The director surveys the job and the same crew installs it, so there is no handover between a salesperson's promise and an engineer's reality.

One price, one programme, one person answering the phone.

Book a site survey

Getting a block lift replaced, stage by stage weeks
Survey lift and produce report 2 wk
Review report and plan works 4 wk
Write site-specific specification 4 wk
Tender works to five companies 4 wk
Tender analysis and post-tender meetings 4 wk
Our last two-floor rip-out and replacement, first day on site to witness test 4 wk
Paperwork before works begin 18 weeks

Two floors, stripped and replaced, four weeks.

A machine-room-less rip-out and install, finished ahead of programme. First time fitting that particular package and control panel — which is rather the point: the crew is the constant, the equipment changes job to job.

4weeks

First day on site to witness test, on a two-floor machine-room-less replacement. Finished ahead of programme.

Finished ahead of schedule in four weeks, to a very high standard. No trumpet blowing intended.

From our own engineer's write-up of the job, published at the time. We have not edited it.
Scope
Machine-room-less rip-out and install
Levels served
2
Programme
4 weeksfirst day on site to witness test
Against programme
Ahead
Lift package
The Lift Boxthird-party supplied, first install for us
Control panel
NEW LIFT Steuerungsbauthird-party supplied
Handover
Witness tested on site
Client
Lift company, subcontractnamed on request

References and further job records available on request. We would rather send you to a client than describe ourselves.

Survey, programme, fit, witness test.

Five stages, and the same two people through all of them. No account manager, no handover, nobody learning your building twice.

  1. Day 1–3

    The director surveys it himself

    Shaft measured, headroom, pit depth and guide positions checked, power supply and access route looked at, working hours and residents discussed. Bring drawings if you have them; we manage without.

  2. Week 1

    A fixed price and a programme we will hold

    One price, the builder's work set out plainly, a start date. Where a modernisation would serve you better than a replacement we say so — even though it is the smaller job for us.

  3. Lead time

    Equipment ordered, then checked against the shaft

    Package, controller and fixtures ordered against the survey, and checked against the drawing before anything is lifted in. Most delays on a lift job start here, so this is where we are pedantic.

  4. On site

    Strip out, install, adjust

    Protection up, old equipment out, rails, car, doors and controller in, then setting out, levelling and adjustment. The same crew from first day to last — no rotating faces in your building.

  5. Handover

    Witness tested, then the paperwork

    Tested in front of whoever needs to see it, with the test records, commissioning paperwork and the documentation your competent person will want at the first thorough examination.

What your competent person will check.

We install to the designated standards and hand over with the paperwork that proves it. If your consultant wants the detail before we quote, ask — we would rather have that conversation early.

A new lift built to BS EN 81-20 and BS EN 81-50 is presumed to meet the requirements of the Lifts Regulations 2016 that those standards cover. That presumption is what your competent person is looking for at handover. Both parts have applied to every new passenger and goods-passenger lift placed on the UK market since September 2017.

What the law requires

3
Lifts Regulations 2016
The law a new lift must satisfy before it is placed on the UK market.
LOLER 1998
Thorough examination by a competent person — six months for a lift carrying people, twelve for goods only.
CDM 2015
Our duties on site alongside the main contractor and the principal designer.

What we build to

5
BS EN 81-20:2020
Construction and installation: structure, car and counterweight, suspension, guides, doors, electrical equipment, fire behaviour, alarms and rescue.
BS EN 81-50:2020
Design rules, calculations, examinations and tests for the lift's safety components.
BS EN 81-21:2018
New lifts and complete modernisations going into existing buildings — most of our replacement work.
BS EN 81-70
Accessibility: car and landing dimensions, controls and signals for disabled users.
BS 7255
Safe working on lifts. How the crew behaves in your shaft, not what we fit in it.

Who we work for

  • Lift companies
  • Main contractors
  • Lift consultants
  • Project managers
  • Managing agents
  • Housing associations
  • Private clients

Tell us about the shaft.

Five questions, one at a time, and a look at everything before it sends. About a minute.

The survey is free, and so is the advice that follows it. If a modernisation would serve you better than a replacement, we will say so.

Would rather talk? Call 020 0000 0000 and you will get the director, not a queue.

01You speak to the director, not a call handler
02No automated follow-up sequence, ever
03Your details are not passed to anyone else
04A survey slot, usually within the week

Site survey request

Form BSL‑SR

So we know who to ask for when we call back.

Please add your name.

Email is enough. A number just means we can call rather than write.

That does not look like an email address — check for a missing @ or a typo.

We use it to work out access, parking and travel before we quote.

We need an address or a postcode.

What is the job?

Pick the closest one — “not sure yet” is a real answer.

Optional. Skip it and we will ask at the survey.

Here is what we will send.

Nothing leaves this page until you press the button.

We use what you send to answer your enquiry and nothing else.