Blue Sky Lifts installs, replaces and modernises lifts across London — surveyed, fitted and handed over by the same small crew that quoted the job.
Four kinds of job, all of them vertical.
Passenger lifts, goods lifts and platform lifts. If the package and the controller are already on order, we will fit those too — a good share of our work is exactly that.
Eighteen weeks of paperwork before anyone picks up a tool.
That is the standard route for a residential block, start to finish, using the lift industry's own published guidance. Four and a half months — and the lift is still broken.
We are the other end of that process. The director surveys the job and the same crew installs it, so there is no handover between a salesperson's promise and an engineer's reality.
One price, one programme, one person answering the phone.
Two floors, stripped and replaced, four weeks.
A machine-room-less rip-out and install, finished ahead of programme. First time fitting that particular package and control panel — which is rather the point: the crew is the constant, the equipment changes job to job.
4weeks
First day on site to witness test, on a two-floor machine-room-less replacement. Finished ahead of programme.
Finished ahead of schedule in four weeks, to a very high standard. No trumpet blowing intended.
From our own engineer's write-up of the job, published at the time. We have not edited it.
- Scope
- Machine-room-less rip-out and install
- Levels served
- 2
- Programme
- 4 weeksfirst day on site to witness test
- Against programme
- Ahead
- Lift package
- The Lift Boxthird-party supplied, first install for us
- Control panel
- NEW LIFT Steuerungsbauthird-party supplied
- Handover
- Witness tested on site
- Client
- Lift company, subcontractnamed on request
References and further job records available on request. We would rather send you to a client than describe ourselves.
Survey, programme, fit, witness test.
Five stages, and the same two people through all of them. No account manager, no handover, nobody learning your building twice.
-
Day 1–3
The director surveys it himself
Shaft measured, headroom, pit depth and guide positions checked, power supply and access route looked at, working hours and residents discussed. Bring drawings if you have them; we manage without.
-
Week 1
A fixed price and a programme we will hold
One price, the builder's work set out plainly, a start date. Where a modernisation would serve you better than a replacement we say so — even though it is the smaller job for us.
-
Lead time
Equipment ordered, then checked against the shaft
Package, controller and fixtures ordered against the survey, and checked against the drawing before anything is lifted in. Most delays on a lift job start here, so this is where we are pedantic.
-
On site
Strip out, install, adjust
Protection up, old equipment out, rails, car, doors and controller in, then setting out, levelling and adjustment. The same crew from first day to last — no rotating faces in your building.
-
Handover
Witness tested, then the paperwork
Tested in front of whoever needs to see it, with the test records, commissioning paperwork and the documentation your competent person will want at the first thorough examination.
What your competent person will check.
We install to the designated standards and hand over with the paperwork that proves it. If your consultant wants the detail before we quote, ask — we would rather have that conversation early.
A new lift built to BS EN 81-20 and BS EN 81-50 is presumed to meet the requirements of the Lifts Regulations 2016 that those standards cover. That presumption is what your competent person is looking for at handover. Both parts have applied to every new passenger and goods-passenger lift placed on the UK market since September 2017.
What the law requires
3- Lifts Regulations 2016
- The law a new lift must satisfy before it is placed on the UK market.
- LOLER 1998
- Thorough examination by a competent person — six months for a lift carrying people, twelve for goods only.
- CDM 2015
- Our duties on site alongside the main contractor and the principal designer.
What we build to
5- BS EN 81-20:2020
- Construction and installation: structure, car and counterweight, suspension, guides, doors, electrical equipment, fire behaviour, alarms and rescue.
- BS EN 81-50:2020
- Design rules, calculations, examinations and tests for the lift's safety components.
- BS EN 81-21:2018
- New lifts and complete modernisations going into existing buildings — most of our replacement work.
- BS EN 81-70
- Accessibility: car and landing dimensions, controls and signals for disabled users.
- BS 7255
- Safe working on lifts. How the crew behaves in your shaft, not what we fit in it.
Who we work for
- Lift companies
- Main contractors
- Lift consultants
- Project managers
- Managing agents
- Housing associations
- Private clients
Tell us about the shaft.
Five questions, one at a time, and a look at everything before it sends. About a minute.
The survey is free, and so is the advice that follows it. If a modernisation would serve you better than a replacement, we will say so.
Would rather talk? Call 020 0000 0000 and you will get the director, not a queue.